Capstone expects to own a 50% interest in the ZEP Wind Farm Ganaraska project alongside a financial partner.

The ZEP Wind Farm Ganaraska project will generate clean, renewable energy for the local grid, displacing greenhouse gases, air pollution and toxic wastes produced by traditional energy sources. It's estimated that the wind farm will generate enough electricity to power the equivalent of 6, 000 homes annually. 

 

In comparison to other forms of electricity generation, wind energy is:

 

·        Renewable, efficient and complementary to other sources of electricity such as hydro, solar and natural gas

·        Emission-free, thereby helping to mitigate climate change

·        Helping to conserve water resources as water is not consumed in the generation of electricity

·        Associated with few environmental effects

 

As a result, the project will benefit the natural environment in the municipality and province overall while helping Ontario to meet future electricity demand.


Canada’s current installed capacity is just over 8,000 MW, generating the equivalent electricity consumed by an average of 2 million Canadian homes.

 


 

We are committed to socially and environmentally sustainable practices in every aspect of our business.  Our goal is to foster a positive culture that is respectful of our partners, customers and communities and to maintain open, mutually beneficial relationships with all stakeholders. 

 

Welcome to the project announcements page. The proposed ZEP Wind Farm Ganaraska project is subject to provincial approval under Part V.0.1 of the Environmental Protection Act (O. Reg. 359/09). Under the regulation, the 17.60 megawatt (MW) project is defined as a Class 4 wind facility. The project will consist of nine (9) Senvion (formerly named REpower) MM92 wind turbines, which will have a nameplate capacity of 2.05 MW or 1.88 MW and a hub height of 100 metres. In addition to the wind turbines, the project will also include access roads, an electrical collection system, a substation, and temporary construction facilities. The project is located in the Municipality of Clarington, Ontario near the town of Orono.

If you have any questions or comments please let us know. Contact details are provided on the Contact Us page. If you would like to be added to the project mailing list, please send us an email at cpdev@capstoneinfra.com. 

Notice of Community Liaison Committee Meeting

A Community Liaison Committee meeting will be held on Wednesday November 22, 2017 from 6:30-8:30 p.m. at the Orono Arena and Community Centre located at 2 Princess St, Orono, ON. The meeting is open to the general public for observation. A copy of proposed agenda and the notice including Project team contact information is available for download below.

Meeting Agenda Download  126 KB

Meeting Notice Download  395 KB


Update from Community Liaison Committee Meeting #2 

The second Community Liaison Committee meeting was held on May 2, 2017. The meeting was attended by a number of public spectators as well as members of the committee.
    
Meeting Minutes Download  145 KB
Meeting #2 Presentation Download  1.01 MB

Complaint Resolution Protocol

Download  852 KB

Notice of Community Liaison Committee Meeting

A Community Liaison Committee (CLC) meeting will be held on Tuesday, May 2, 2017 from 6:30-8:30 p.m. at the Orono Arena and Community Centre (2 Princess St, Orono, ON L0B 1M0). For more information about the CLC, please download the notice below.

Download 262 KB

The 2016/2017 Community Enhancement Fund Information Package is now available for review. 

The Community Enhancement Fund was created during the project planning phase of the Ganaraska Wind Farm with the intent to provide funding for community-based initiatives that will directly benefit and add to the quality of life of the rural residents and community members living and working in the area near our wind farm. Interested applicants are asked to submit the Application Form and Media Consent Form by January 31, 2017. Any inquiries on the Community Enhancement Fund and application process may be directed at Amanda Dillon, Manager, Communication at 416-649-1325 or adillon@capstoneinfra.com.

Download        679  KB     

Update from Community Liaison Committee Meeting #1

The first Community Liaison Committee meeting was held on October 25, 2016. The meeting was attended by a number of public spectators as well as members of the committee. The following documents were reviewed and/or approved by the committee.
    
Community Liaison Committee – Overview and Terms of Reference Download        455  KB    
Community Liaison Committee – Complaint Resolution Protocol Download        852  KB    
Project Map Download        358  KB    
Meeting Minutes Download        164  KB    
Meeting #1 Presentation Download        679  KB    

Notice of Community Liaison Committee Meeting

A Community Liaison Committee meeting will be held on Tuesday October 25, 2016 from 6:00 p.m. to 8:00 p.m. at the Orono Arena and Community Centre located at 2 Princess Street, Orono ON.  The meeting is open to the general public for observation.  The goal of the CLC will be to update the community on Project milestones, activities, issues, issue resolution and mitigation. If you are interested in asking questions or relaying information about the Project, please submit comments and questions by Tuesday October 18, 2016 and the Project team will answer submitted questions at the meeting. A copy of the notice including Project team contact information is available for download below.

Download        234  KB         

Community Liaison Committee
November 18, 2015 – The Project team is establishing a Community Liaison Committee (CLC), a forum to exchange ideas, share information and provide regular updates on the Project. If you would like to serve as a member of the CLC, please provide your contact information and a short description of your interest in the Project by December 9, 2015. To learn more about the CLC, please download the notice below.

Download  1578 KB

Update to Website Documents
February 05, 2015 – Please note that upon REA issuance, the following updated reports have been posted to the Documents page of the Project’s website: 1) a revised Design and Operations Report Appendix V Natural Heritage Environmental Effects Monitoring Plan (EEMP), dated October 3rd, including an EEMP confirmation letter from MNRF dated October 31, 2014; 2) the Natural Heritage Records Review, Site Investigation, Evaluation of Significance, and Environmental Impact Study reports have been updated to remove the word “draft” from the report titles. No other changes have been made to these reports.

Renewable Energy Approval Issued
February 5, 2015 – On January 30, 2015, the project received a Renewable Energy Approval (REA), issued in accordance with Section 47.5 of the Environmental Protection Act. A copy of the REA No. 1426-9RWTSS can be downloaded below.

Download     4189 KB

Notice of Project Change
December 30, 2014 - Following consultation with the MOECC, the project has been modified to remove two turbine sites (T2 and T7), and is now proposed to include up to nine turbines, and maximum nameplate capacity of 17.60 MW. A Noise Assessment Report was prepared for the project which is available on the project website and demonstrates compliance with the 40 dBA noise limit at all non-participating receptors and vacant lot noise sensitive receptors in the area. The locations for the remaining turbines, and the substation, remain unchanged.

For further information regarding this project change, please see the Modification Report in the documents section of the project website. Moreover, Appendix C of the Modification Report includes the Noise Assessment Report, which has also been posted in the documents section of the project website for direct access.

Download       778 KB

Spring 2014 Newsletter
June 16, 2014 (published April 2014) - A newsletter introducing Capstone Infrastructure to the community, and providing an update on the project.

Download  402 KB
 
Notice of Posting to Environmental Registry
January 15, 2014 - A proposal for a Renewable Energy Approval in respect of the Wind Farm Ganaraska project has been posted on the Environmental Registry (

www.ebr.gov.on.ca

Registry Number: 012-0793) referred to in Section 5 of the Environmental Bill of Rights, 1993 and that comments in respect of the proposal may be submitted to the Director. All comments received prior to February 21, 2014 will be considered as part of the decision-making process by the Ministry of the Environment if they are submitted in writing or electronically using the form provided in the Environmental Registry notice.

Download   578 KB

New Project Ownership
The project was initially proposed by ZEP Wind Farm Ganaraska, whose parent company was Wind Works Power Corp. In mid-2012, Renewable Energy Developers Inc.(then named Sprott Power Corp.) became involved in the project and have since been responsible for the project design and managing project development. In August 2013, Renewable Energy Developers Inc. acquired a majority interest in the project through a subsidiary and the REA application was assigned to Ganaraska Nominee Ltd. Through the acquisition of Renewable Energy Developers Inc. by Capstone Infrastructure Corporation (“Capstone”) which was finalized on October 1, 2013, Capstone now holds a majority interest in the project.

Presentation from Open House
January  24, 2013 - The final public open house held on January 24, 2013 included a presentation.

Download   583 KB

Notice of Final Public Open House
January 21, 2013 - Notice of Final Public Open House scheduled for January 24, 2013 at the Clarke High School.

Download   326 KB

Follow up to Questions from Interim Meeting on December 20, 2012
An interim public meeting was held for the proposed project at the Ganaraska Forest Centre on December 20, 2012. Sprott Power Corp. committed to following up with more information in response to the following questions.

Download   156 KB

Notice of Relocated Interim Public Meeting
December 14, 2012 - Notice of Relocated Interim Public Meeting scheduled for December 20, 2012 at Ganaraska Forest Centre.

Download   194 KB

Notice of Final Public Meeting
November 21, 2012 - Notice of Final Public Meeting scheduled for January 24, 2013 at the Clarke Highschool.

Download   277 KB

Notice of Draft Site Plan
October 10, 2012 - A Notice of Draft Site Plan was published for the project on October 10, 2012 in accordance with O. Reg. 359/09.  The Draft Site Plan documents are available on the Documents page. 

Download  273 KB

Notice of Initial Public Meeting
June 21, 2010 - Notice of Initial Public Meeting that was distributed via newspaper, mail, and hand delivery in June 2010.

Download  317 KB





The proposed ZEP Wind Farm Ganaraska project is subject to provincial approval under Part V.0.1 of the Environmental Protection Act (O. Reg. 359/09). Under the regulation, the 17.60 megawatt (MW) project is defined as a Class 4 wind facility.  The project will consist of nine (9) Senvion (formerly named REpower) MM92 wind turbines, which will have a nameplate capacity of 2.05 MW or 1.88 MW and a hub height of 100 metres. In addition to the wind turbines, the project will also include access roads, an electrical collection system, a substation, and temporary construction facilities. The project is located in the Municipality of Clarington, Ontario near the town of Orono.


Project Location Map  Download - 3,510 KB

Renewable Energy Approval No. 1426-9RWTSS Download

Community Liaison Committee - Complaint Resolution Protocol Download - 849 KB


Reports prepared in support of an application for a Renewable Energy Approval (“REA”) were completed to satisfy the requirements of O. Reg. 359/09 and can be downloaded below.    Other documents and information related to the REA process will also be posted here as they become available.




SizeSelect PDF
Download
Project Description Report - March 25, 20133,319 KBDownload
Natural Heritage Reports
Delineation and evaluation of natural heritage features, including woodlands, wetlands and wildlife habitat.
Includes a Records Review Report, Site Investigation Report, Evaluation of Significance Report
and Environmental Impact Study Report
.
NHA Records Review Report4,570 KBDownload
NHA Site Investigation Report - Main Body2, 741 KBDownload
NHA Site Investigation Report - Appendix A, B, C1,959 KBDownload
NHA Site Investigation Report - Appendix D,E,F, G4,302 KBDownload
NHA Evaluation of Significance Report5,630 KBDownload
NHA Environmental Impact Study Report3, 868 KBDownload
NHA and Environmental Impact Study Addendum6, 211 KBDownload
NHA Confirmation Letter22 KBDownload
NHA Re-Confirmation Letter398 KBDownload
Bat Maternity Roosting Habitat-use Surveys Report2, 851 KBDownload
Botanical Inventory Report4, 550 KBDownload
Water Reports
Identifies water bodies in the vicinity of the project location, and potential environmental effects on water bodies,
as well as associated mitigation measures.
Water Bodies Impact Assessment Report2,845 KBDownload
Water Assessment Report4, 696 KBDownload
Water Assessment Report - Appendix A462 KBDownload
Water Assessment Report - Appendix B Part 18, 420 KBDownload
Water Assessment Report - Appendix B Part 28, 967 KBDownload
Water Assessment Report - Appendix C3, 368 KBDownload
Construction Plan Report
Overview of construction activities, their potential environmental impacts and mitigation measures.
Construction Plan Report4,473 KBDownload
Construction Plan Report Appendices9, 919 KBDownload
Design and Operations
Overview of project design and operational impacts, including environmental impacts and mitigation measures.
Detailed reports included within the appendices include cultural heritage and archaeology
(Stage1-2), shadow flicker, telecommunications impact, noise impact, and the natural
heritage environmental effects monitoring plan (EEMP). 

Design and Operations Report2, 161 KBDownload
Appendix I - Site Plan (March 25, 2013)4,272 KBDownload
Appendix II - Cultural Heritage Assessment Report7, 591 KBDownload
Appendix II - Cultural Heritage Confirmation Letter124 KBDownload
Appendix IIA - Cultural Heritage Assesment Report (Part 1)9,117 KBDownload
Appendix IIA - Cultural Heritage Assessment Report (Part 2)7, 315 KBDownload

Renewable Energy Approval Reports
The reports available below include all reports prepared in support of the Renewable Energy Approval application.
The Ministry of the Environment issued a Renewable Energy Approval for the project in January 2015.

Project Description Report
This report provides an overview of Wind Farm Ganaraska, including summaries of the environmental impacts
that are further investigated in the other REA reports prepared in support of the application for a Renewable
Energy Approval.

Appendix IIA - Cultural Heritage Assessment Report (Part 3)6, 047 KBDownload
Appendix IIB - Cultural Heritage Assessment Report591 KBDownload
Appendix III - Shadow Flicker Report3,147 KBDownload
Appendix IV - Radar and Radio Communications Impact Assessment5,638 KBDownload
Appendix V - Natural Heritage Environmental Effects Monitoring Plan (EEMP)5,638 KBDownload
Appendix VI - Forms55 KBDownload
Appendix VII - Archaeological Assessment Report4,580 KBDownload
Appendix VII - Archaeology Confirmation Letter98 KBDownload
Noise Assessment Report
Report demonstrating compliance with the provincial 40 dBA noise limit.
Noise Assessment Report - Main Body2, 527 KBDownload
Noise Assessment Report - Appendices8,950 KBDownload
Decommissioning Plan Report
Overview of procedures related to dismantling project infrastructure.
Decommissioning Report2, 193 KBDownload
Wind Turbine Specification Report
Wind turbine specification report for the REpower MM92 (Senvion MM92)
.
Wind Turbine Specification Report546 KBDownload
Consultation Report
Details of consultation activities conducted with respect to the project.
Consultation Report544 KBDownload
Consultation Report - Appendix A2, 657 KBDownload
Consultation Report - Appendix B89 KBDownload
Consultation Report - Appendix C1,613 KBDownload
Consultation Report - Appendix D362 KBDownload
Consultation Report - Appendix E362 KBDownload
Consultation Report - Appendix F2, 032 KBDownload
Consultation Report - Appendix G3, 335 KBDownload
Modification Report
Document prepared in respect of a project change to update the REA application for the project.
Modification Report - Main Body10, 011 KBDownload
Modification Report - Appendices9, 109 KBDownload
Visual Simulations
Photomontages provide a visual simulation of what the project would look like from various viewpoints
around the project area.
Visual Simulation #16,860 KBDownload
Visual Simulation #24,004 KBDownload
Visual Simulation #38,100 KBDownload
Visual Simulation #48,100 KBDownload
Visual Simulation #54,380 KBDownload
Visual Simulation #60 KBDownload
Visual Simulation #70 KBDownload
Visual Simulation #86,007 KBDownload
Photomontage Vantage Points Map411 KBDownload
Draft Site Plan
A Draft Site Plan was issued in accordance with section 54.1 of the regulation on October 10, 2012.
For the Notice of Draft Site Plan please refer to the Announcements page.
Draft Site Plan 16, 053 KBDownload
Appendix to Draft Site Plan 1430 KBDownload
Draft Site Plan 25,151 KBDownload
Appendix to Draft Site Plan 2263 KBDownload
Post Construction Bird & Bat Mortality Monitoring Results
2016 Fact Sheet164 KBDownload
Post Construction Amphibian Monitoring Results
2016 Fact Sheet38 KBDownload

In the event of an emergency, please contact our 24-hour toll-free emergency contact number at 1-888-429-4764.

To learn more about the Ganaraska Wind Farm, contact:

John Kirby
Director of Wind Operations – Ontario
Capstone Power Corp.
Email: jkirby@capstoneinfra.com
Phone: (519) 874-1461

For complaints or other comments, questions and concerns, contact:

Dana Sallouha
HSE Coordinator
Capstone Infrastructure Corp.
Email: dsallouha@capstoneinfra.com
Phone: (416)649-1327

For media enquiries and investor relations information, contact:


Amanda Dillon
Manager, Communications
Capstone Infrastructure Corp.
Email: info@capstoneinfra.com
Phone: (416) 649-1325

Capstone Infrastructure Corporation

Corporate Office
155 Wellington Street West, Suite 2930
Toronto, ON M5V 3H1